The Incahuasi Project started at the end of 2013. It consisted in a gas pipeline constructed in Bolivia by the French oil company TOTAL. Located 250 km (155 miles) southwest from Santa Cruz, the project develops three wells: one in Aquío and two in Ipati, and a gas processing plant with 6,5 million cubic meters (230 million cubic feet) a day.
Grupo Cuñado has been involved in this project, supplying 30,000 t of 30-inch pipe, all managed by the logistical service of the Group. The material covered more than 1,400 km (870 miles) from Arica (Chile) across Bolivia, utilising over 2,000 trucks.
The result of this Project has been more than satisfactory. The material was supplied ahead of schedule, saving TOTAL $6M, therefore gaining their
appreciation.